Document every process in the ERP system for tracking. Check product dimensions with thread gauge, caliper, micrometer and other tools anytime. 100% inspection before surface treatment and trimmed burrs to ensure smooth. Perform random salt spray test on the product after the surface treatment is completed.
After-production:
Check fittings with tools and test machines, such as thread gauges.
Check the appearance of the fittings before packaging again.